N.E.W.B.I.E.S.
  • News and Highlights
  • Technology
    • Pilot Project
    • Lab-scale innovation
    • Publications
  • About
    • Partners
    • Contact
Select Page

PP#4: Second results on digestate

by Sam Molenaar | Apr 29, 2020 | Pilot progress | 0 comments

PP4.7 Urine foaming

Foaming urine as it recirculates, feeds in and bleeds out of the system.

PP4.6 Membrane characterization

Membranes of the used stack are characterized to observe any possible changes in behaviour

PP4.5 Urine collection tank internal

Sub-surface suction using a balloon and hose in the second urine tank minimizes solids and floating biomass to enter the ED installation

PP4.4 Urine collection tanks

Urine collection tanks. The first one serves mainly for providing retention / setlling time

PP4.3 Newbies at the Dyke

View of the pilot and the old dijk.

PP4.2 NEWBIES and Arneco

Pittoresk place for a pilot installation

PP4.1 arrival of NEWBIES

Arrival of the N.E.W.B.I.E.S. container to the premises of eco-community Arneco in Arnhem, the Netherlands. Truck colour was not chosen.